The safest way to plan a kitchen renovation is to settle decisions that affect measurements and services before ordering the finishes that depend on them. A useful sequence starts with the household's needs and a measured layout, then coordinates appliance models, plumbing and electrical work, surfaces, cabinetry, installation checks and handover. The exact order can change with the existing room, selected products and the installers' methods. For a home in Al Ahsa, Hofuf or Mubarraz, use this guide as a coordination checklist to discuss with the appointed design and construction professionals—not as a universal construction specification.
1. Define the work before choosing the finish
Write down what is not working in the current kitchen and what the renovation must change. Separate essential repairs from layout improvements and optional decorative updates. Decide which cabinets, appliances, plumbing points and finishes might remain, but mark each as provisional until the site and condition have been checked. This short brief prevents a finish sample or an attractive image from becoming the project scope by accident.
Draw a simple plan showing doors, windows, fixed columns, existing services and the main walking routes. Mark how people cook, prepare food, clean and store everyday items. If a wall may move, or if concealed damage is suspected, have the responsible professional assess it before treating the layout as approved. Agree who coordinates the design, quotations, site decisions and approvals so instructions do not arrive from several people without a clear record.
2. Measure the room and confirm appliances early
Record the room dimensions and the locations of openings, corners and visible service connections. The project team should verify the measurements it will use for fabrication; an old drawing or a single wall measurement is not a substitute for a current site survey. Note any uneven walls or floor levels that may affect fitted units, and ask how these conditions will be handled in the drawings and quotation.
Select or shortlist the actual refrigerator, oven, cooktop, dishwasher and hood before final cabinet dimensions are approved. Keep the model references and manufacturer installation instructions together. Check door swing, ventilation space, service access, power or water requirements, and the route needed to bring an appliance into the home. A nominal product width is not the same as its complete installation envelope, so ask the supplier and relevant trades to verify the selected models against the plan.
3. Agree the scope, quotations and work handoffs
Prepare one written scope that describes what is removed, retained, repaired, supplied and installed. Ask each bidder to price the same drawings, appliance schedule, material references and exclusions. Record unresolved items as questions or allowances rather than assuming they are included. This makes a quotation comparison more useful than choosing a contractor from a total that may cover a different scope.
Before work starts, identify who protects the rest of the home, removes waste, isolates or reconnects services, confirms hidden conditions, approves substitutions and records changes. Agree how the household will manage cooking and access while the kitchen is unavailable. Confirm any property-specific approvals or professional reviews with the appointed qualified office and relevant local authority; this guide does not determine whether a particular alteration requires a permit.

4. Remove carefully and review what is behind the old kitchen
Once the scope and responsibilities are clear, the responsible team can plan protection, disconnection and removal. Demolition should follow the agreed site method and be handled by the appropriate trades; do not treat a picture or a general online sequence as instructions for disconnecting electricity, gas or water. Photographing the exposed area for the project record can help the team discuss the actual condition before it is covered again.
After removal, compare the exposed walls, floor and service locations with the approved layout. Stop to document a leak, damaged surface, unexpected pipe or wiring route, or a dimension that changes the design. Ask the responsible professional to assess the finding and update the scope or drawing before the next trade proceeds. A quick written decision at this point can prevent new cabinets, tiles or worktops being ordered against assumptions that the site has disproved.
5. Coordinate plumbing, electrical and ventilation work before closing surfaces
If the layout changes, confirm the proposed sink, dishwasher, cooking equipment, hood and socket locations on one coordinated plan. The appointed qualified trades should check the actual equipment requirements, service routes and applicable safety provisions. Have changes and tests recorded by the professionals responsible for that work. Do not copy outlet heights, cable sizes, pipe routes or ventilation dimensions from another kitchen; those details depend on the project and applicable requirements.
The Saudi Building Code lists the Saudi Electrical Code (SBC 401) for electrical systems and installations, and the Saudi Existing Building Code (SBC 901) for work involving repair or alteration of existing buildings. These references help owners ask the appointed licensed office which requirements apply; they are not a substitute for a project-specific design or approval. Resolve the service locations before plaster, tile, panels or other finishes hide them, and keep a record of any route or access point that must remain available.
6. Set the floor, wall and cabinet sequence with the installers
There is no single flooring-before-cabinets rule that fits every kitchen. The decision can depend on the cabinet support system, floor finish, appliance installation, future replacement plans and the manufacturer or installer details. Ask the cabinet supplier and flooring installer to show the proposed section at the cabinet plinth, appliance opening and room threshold. Record the agreed finish level and who is responsible for the transition between materials.
Confirm the final wall surfaces, tile areas, paint, backsplash limits and cabinet fixing points on the drawings. The order in which flooring, cabinets and wall finishes are installed should be agreed by the trades who will install the selected products. Check that drawers, doors and appliances can open after adjacent worktops and walls are complete. Do not let one team assume another team will trim, seal, level or protect a surface unless that task appears in the written scope.
7. Template worktops and complete the visible finishes
Some made-to-measure systems take final worktop measurements after cabinets are installed. For example, IKEA India's published kitchen sequence places worktop measurement after cabinet installation. That is a supplier-specific process, not a rule for every product or Saudi kitchen; confirm the required handoff with the selected fabricator. Agree the sink and tap references, cut-out responsibility, edge finish, joins and splashback relationship before fabrication, and keep the approved drawing and sample reference together.
After surfaces are fitted, complete the remaining wall finish, sealant and trim details in the order agreed by the installers. Protect completed work while other trades return to connect appliances or adjust cabinets. Ask who is responsible for final plumbing, electrical and ventilation checks, and make sure access panels or service points are not permanently covered by decorative work. The goal is a coordinated handoff, not an assumed sequence applied to every material.
8. Test the kitchen and document handover
Walk through the agreed scope with the responsible contractor. Open every door and drawer, test the appliance controls using their instructions, check the sink and visible connections for normal operation, and confirm that the hood and lighting operate as specified. These are owner observation points, not a replacement for electrical, plumbing or appliance testing by qualified people. Record incomplete work by location and description, and agree the correction and follow-up process in writing.
Keep the final drawings, approved substitutions, appliance manuals, product and hardware references, care instructions, warranties and service contacts in one project file. Note where concealed services run if the appointed trades provide that record. A well-organized handover makes future maintenance and repairs easier to discuss. For related choices, see our guides to selecting a kitchen backsplash, planning a ducted or recirculating hood, and coordinating a main contractor with separate trades.
Your practical checklist
- Write a scope that separates required repairs from optional updates.
- Verify the room on site and mark existing openings and service connections.
- Record appliance models and installation requirements before cabinet approval.
- Compare quotations against the same drawings, materials and exclusions.
- Agree how unexpected conditions will be documented and approved.
- Coordinate plumbing, electrical and ventilation work before surfaces are closed.
- Ask the flooring and cabinet installers to agree the finished levels and sequence.
- Confirm worktop templating, sink cut-outs and finish interfaces with the selected fabricator.
- Walk through operation, record incomplete work and retain handover documents.
Frequently asked questions
What is the best order to renovate a kitchen?
Start with the brief and measured layout, confirm appliances and scope, plan removal and review the exposed room, coordinate service changes, then agree finishes, cabinets, worktops, final connections and handover with the selected installers. The exact order depends on the site and products.
What should be done first in a kitchen renovation?
Define what the household needs to change and have the existing room measured before ordering items that depend on those dimensions. Appliance models and service locations should be coordinated early with the design and trade teams.
Should kitchen flooring be installed before or after cabinets?
There is no universal answer. Ask the cabinet and flooring installers to agree the chosen system, finished floor level, appliance openings, plinth details and future replacement approach, then record that sequence on the project plan.
When should the kitchen worktop be measured?
Ask the selected fabricator. Many fitted systems are templated after the supporting cabinets are installed and checked, but the required handoff depends on the material and product details. Confirm sink cut-outs and joins before fabrication.
Does a kitchen renovation always need the same trades in the same order?
No. The scope, existing services, products, site findings and trade methods can change the sequence. A coordinated plan should name the responsible person for each handoff and be updated when the exposed site differs from the drawings.
Sources and further reading
Sources support the specific facts identified below. Planning examples and checklists are editorial guidance; photographs are illustrative.
- Saudi Building Code — SBC 901: Existing Building Code (2024) — The Saudi Building Code Center describes SBC 901 as covering existing-building repairs, alterations, additions and occupancy changes. Cited only as an official reference for asking a qualified office which requirements apply; it does not establish a permit decision for a particular kitchen.
- Saudi Building Code — SBC 401: Electrical Code (2024) — The official code page identifies SBC 401 as covering the design, installation, operation and safety of building electrical systems. The article provides no wiring specifications and directs technical decisions to qualified project professionals.
- IKEA India: kitchen installation and worktop measurement sequence — This supplier page says its worktop measurement team visits after its cabinet installation is complete. Used only as an example of one supplier-specific workflow, not as a universal or Saudi-market installation rule.